8 application types
Application types
The catalogue
Pick a type to see its documents and checks
Householder
Householder planning permission
For extensions, loft conversions and dormers, porches, garden rooms and garages, and fences, walls or driveways at a house, when the works need planning permission. Not for flats, new homes or a change of use.
3 documents always needed · 101 checks
Full planning permission
Full planning permission (minor development)
For up to 9 new homes, conversions into flats, changes of use, works to flats and commercial buildings, and new shopfronts. Not for extensions to a house (use householder) or major development.
4 documents always needed · 114 checks
Trees
Works to protected trees
Consent to cut down or prune a tree with a Tree Preservation Order, or 6 weeks' notice for a tree in a conservation area. There's no fee.
2 documents always needed · 22 checks
Lawful development certificates
Lawful development certificate (proposed)
A legally binding confirmation from the council that something you plan to do, most often a permitted development extension, loft conversion or outbuilding, would be lawful without planning permission.
2 documents always needed · 65 checks
Listed buildings
Listed building consent
For works that affect the character of a listed building, inside or out: alterations, extensions and demolition. Often needed alongside planning permission.
7 documents always needed · 75 checks
Prior approval
Prior approval: larger single-storey rear extension
For a single-storey rear extension deeper than 3 m (4 m for a detached house) and up to 6 m (8 m detached), under permitted development. The council asks your neighbours and only looks at the effect on them.
2 documents always needed · 41 checks
Advertisements
Advertisement consent
Consent to display a sign or advert, such as an illuminated fascia, a projecting sign, a totem or a hoarding, when it doesn't have deemed consent.
4 documents always needed · 24 checks
Lawful development certificates
Lawful development certificate (existing)
A legally binding confirmation that an existing use, building work or breach of a condition is lawful, usually because it has gone on long enough that no enforcement action can be taken.
4 documents always needed · 34 checks
National and local
Two layers: the national requirements and your council's local list
National requirements
The same in every English planning authority
- The Development Management Procedure Order 2015, article 7: application form, location plan, other plans and drawings, ownership certificate, fee, design and access statement where required
- The national information requirements in Planning Practice Guidance (making an application)
- The regulations for each type: the General Permitted Development Order 2015 for prior approval, the listed building regulations, the tree preservation regulations and the advertisement regulations
- Every check names its article or paragraph, with a link to the source
Your local validation list
Added per council when it joins
- Items from the council’s published local list go on top of the national requirements: for example a flood risk assessment, a heritage statement or a tree survey in set situations
- Each item keeps the paragraph of the local list it comes from
- A council may only insist on a local item if its list was published or republished within the two years before the application (DMPO 2015 article 11(3))
- The council approves each version; applications already running keep the version they started with
Before a council joins, its page on ValidFirst runs on the national requirements only. How a council sets up its local list.
A check, not a decision
What these pages are, and aren't
Guidance, with sources
Each requirement is written in plain English and cites where it comes from, so an applicant or agent can check it for themselves.
Permitted development is a hint
Where an application may not be needed, the page says so with the rule. It is never a promise: a lawful development certificate or the council gives certainty.
The council decides
Whether an application is valid is the council's statutory decision. ValidFirst shows what is there and what is missing; the validation officer decides.