Skip to content
← All application types

Lawful development certificates

Lawful development certificate (existing)

A legally binding confirmation that an existing use, building work or breach of a condition is lawful, usually because it has gone on long enough that no enforcement action can be taken.

Decision period
8 weeks from the day after the council receives a valid application (DMPO 2015 art. 39(10)), or a longer period you agree in writing.
Documents
4 always needed, 2 depending on the proposal
Checks
34 · last checked 14 November 2026

Work this type is for

In the words applicants use. ValidFirst suggests this type when someone describes work like this.

  • existing use certificate
  • lawful development certificate existing
  • CLEUD
  • 10 year rule
  • immune from enforcement
  • regularise
  • existing outbuilding used as a home
  • existing flat conversion
  • breach of condition
  • proof for sale

The documents, and what each must show

Documents that are always needed come first. Each point is what the check looks for, with the article or guidance it rests on. The council’s local validation list can add to these.

  1. Location plan

    Always needed

    A map that shows where the site is, with the site edged in red. Buy one from a Planning Portal-accredited map supplier: they're Ordnance Survey based, at 1:1250, and come with the red line drawn for you.

    Draw the red line around the whole property, including the garden and the drive up to the road. Edge any other land you own nearby in blue.

    What it must show

    Common mistakes
    • The red line only goes round the extension, not the whole property.
    • The red line stops short of the road, so the access isn't included.
    • A screenshot from an online map: no scale, no north point.
    • An old map that doesn't show recent extensions or new houses next door.

    Required by DMPO 2015 art. 39(2)(a)

  2. Plans and drawings of what exists

    Always needed

    Drawings of the building or works as they are now, and for a use, floor plans showing where the use takes place.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • Drawn to a stated metric scale, normally 1:50 or 1:100, and the paper size is given (or a scale bar is shown).DMPO 2015 art. 7(2); council local validation lists
    • The plans show exactly the part of the land or building the use or works cover; if there's more than one use, which part each relates to.DMPO 2015 art. 39(4)
    • The drawings show the use or operations described in the application details.PPG Lawful development certificates, para. 005 (ID 17c-005-20140306)

    Required by DMPO 2015 art. 39(2)(b)

  3. Application form

    Always needed

    The lawful development certificate application form (existing use or development). On the Planning Portal, save or download the PDF of your draft application and upload it here.

    What it must show

    Required by DMPO 2015 art. 39(1)

  4. Documentary evidence

    Always needed

    Records that prove the dates: council tax or business rates bills, utility bills, tenancy agreements, accounts, dated photographs, aerial photos, builders' invoices, building control certificates.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • Each document is dated and relates to this address.DMPO 2015 art. 39(2)(b)
    • Together the documents cover the whole period relied on (10 years for most cases), without unexplained gaps.TCPA 1990 s.171B(3)
    • The documents are listed or indexed with what each shows.Council practice on LDC evidence
    Common mistakes
    • Evidence that covers only part of the 10 years.
    • Undated photographs.
    • Letters from neighbours that aren't sworn and don't give dates.

    Required by DMPO 2015 art. 39(2)(b)

  5. Statutory declarations

    Recommended

    Sworn statements, made before a solicitor or commissioner for oaths, from you and from others with first-hand knowledge (former owners, neighbours, tenants), describing the use or works and their dates.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • Each statement is a properly made statutory declaration (or affidavit), signed and witnessed.Planning Inspectorate and council practice on LDC evidence
    • Each says how the person knows the facts (first-hand knowledge) and covers the whole period relied on.PPG Lawful development certificates, para. 006 (ID 17c-006-20140306)
    • Dates and the use or works are stated precisely and consistently with the application.PPG Lawful development certificates, para. 006 (ID 17c-006-20140306)
    • Each refers to a plan or photographs identifying the land or building.Council practice on LDC evidence

    Required by DMPO 2015 art. 39(2)(b)

  6. Photographs of the site

    Recommended

    Recent photos of the building and the area where the works will go. Not required nationally, but some councils ask for them and they speed up the officer's assessment.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • The photos show the parts of the building and site where the works will go, and the neighbouring property next to them.Council local validation lists
    • The photos are recent and show the site as it is now.Council local validation lists

    Required by Council local validation lists