Prior approval: larger single-storey rear extension

For a single-storey rear extension deeper than 3 m (4 m for a detached house) and up to 6 m (8 m detached), under permitted development. The council asks your neighbours and only looks at the effect on them.

Decision period
42 days from the day the council receives your notification. If the council hasn't told you its decision by then, you may build as described (GPDO 2015 Sch. 2 Pt 1 para. A.4(10)(c)).
Documents
2 always needed, 3 depending on the proposal
Checks
41 · last checked 14 November 2026

You may not need to apply

You may not need this at all: a single-storey rear extension no deeper than 3 m (4 m for a detached house), no higher than 4 m, with eaves no higher than 3 m if within 2 m of a boundary, is ordinary permitted development without any application (GPDO 2015 Sch. 2 Pt 1 Class A). That doesn't apply to flats and maisonettes, or where permitted development rights have been removed.

This is a hint, not a promise. Conservation areas, listed buildings, Article 4 directions and earlier conditions can remove permitted development rights. For certainty, apply for a lawful development certificate or ask the council.

Work this type is for

In the words applicants use. ValidFirst suggests this type when someone describes work like this.

  • larger home extension
  • 6 metre extension
  • 8 metre extension
  • neighbour consultation scheme
  • prior approval extension
  • big rear extension
  • kitchen extension without planning permission

The documents, and what each must show

Documents that are always needed come first. Each point is what the check looks for, with the article or guidance it rests on. The council’s local validation list can add to these.

  1. Written description

    Always needed

    A written description of the extension with the three key measurements. On the Planning Portal this is the prior approval form; save or download the PDF and upload it here.

    What it must show

    Required by GPDO 2015 Sch. 2 Pt 1 Class A, para. A.4(2)(a)

  2. Plan of the site and extension

    Always needed

    A plan showing the property, the proposed extension and any existing extension it joins.

    What it must show

    Required by GPDO 2015 Sch. 2 Pt 1 Class A, para. A.4(2)(b)

  3. Location plan

    Recommended

    Not required by the GPDO itself, but many councils ask for one, and it makes the site unmistakable. Buy an Ordnance Survey based plan at 1:1250 with the site edged in red.

    Draw the red line around the whole property, including the garden and the drive up to the road. Edge any other land you own nearby in blue.

    What it must show

    Common mistakes
    • The red line only goes round the extension, not the whole property.
    • The red line stops short of the road, so the access isn't included.
    • A screenshot from an online map: no scale, no north point.
    • An old map that doesn't show recent extensions or new houses next door.

    Required by GPDO 2015 Sch. 2 Pt 1 para. A.4(8)

  4. Proposed elevations

    Recommended

    Drawings of each side of the building as it will look after the works, with heights and materials. Not required by the GPDO itself, but councils use them to judge the effect on neighbours, and may ask for them.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • Drawn to a stated metric scale, normally 1:50 or 1:100, and the paper size is given (or a scale bar is shown).DMPO 2015 art. 7(2); council local validation lists
    • Clearly titled 'proposed', with each elevation labelled (front, rear, side, or by compass direction).DMPO 2015 art. 7(1)(c)(ii)
    • Every elevation that changes is drawn, including the side facing a neighbour.DMPO 2015 art. 7(1)(c)(ii)
    • The new part is drawn together with the existing building, so its height can be compared with the existing roof and eaves.GPDO 2015 Sch. 2 Pt 1 Class A, para. A.1(c)
    • Heights are dimensioned from ground level: ridge or top of the roof, and eaves (or parapet for a flat roof).GPDO 2015 Sch. 2 Pt 1 Class A, para. A.1(d)
    • External materials are written on the drawing (walls, roof, windows, doors), or a materials schedule is referred to.DMPO 2015 art. 7(1)(c)(ii)
    • New windows, doors and rooflights are shown, with side-facing upper-floor windows marked as obscure-glazed where that's proposed.GPDO 2015 Sch. 2 Pt 1 Class A, para. A.3(b)
    • The elevations match the floor plans and the block plan.DMPO 2015 art. 7(1)(c)(ii)
    Common mistakes
    • The side elevation facing the neighbour is missing.
    • No heights, or heights not measured from ground level.
    • Materials not stated.

    Required by GPDO 2015 Sch. 2 Pt 1 Class A, para. A.4(8)

  5. Proposed floor plans

    Recommended

    Drawings of each floor as it will be after the works, with the new part clearly shown. Not required by the GPDO itself, but councils use them to judge the effect on neighbours, and may ask for them.

    What it must show

    • The file opens and can be read: not password-protected, not corrupted, and text and dimensions are legible when zoomed in.
    • Drawn to a stated metric scale, normally 1:50 or 1:100, and the paper size is given (or a scale bar is shown).DMPO 2015 art. 7(2); council local validation lists
    • Clearly titled 'proposed'.DMPO 2015 art. 7(1)(c)(ii)
    • Every floor the works affect is shown (for a loft conversion, the new loft floor and the floor below with the new staircase).DMPO 2015 art. 7(1)(c)(ii)
    • Room uses are labelled.DMPO 2015 art. 7(1)(c)(ii)
    • The overall external size of the new part is dimensioned (depth and width).DMPO 2015 art. 7(1)(c)(ii)
    • New work is told apart from what is there now (shaded, hatched or annotated).DMPO 2015 art. 7(1)(c)(ii)
    • The plans match the elevations and the block plan: same depth, same openings, same position.DMPO 2015 art. 7(1)(c)(ii)

    Required by GPDO 2015 Sch. 2 Pt 1 Class A, para. A.4(8)